The scheduled annual maintenance of Unit 5 of the Kozloduy Nuclear Power Plant has been completed, the plant announced. The unit was reconnected to the national electricity grid at 9:53 AM following an inspection and a positive assessment by the Bulgarian Nuclear Regulatory Agency.
BTA recalls that Unit 5 of the Kozloduy NPP was shut down for scheduled annual maintenance and refueling with nuclear fuel on May 5. As part of Kozloduy NPP's programme to diversify nuclear fuel supplies, 43 fuel assemblies manufactured by Westinghouse were loaded into the reactor. This marks the beginning of a four-year process of Unit 5's phased transition to RWFA nuclear fuel.
Thousands of citizens have gathered in the center of Sofia to protest against the introduction of the euro. The demonstration is supported by political parties Vazrazhdane, Velichie, Mech, VMRO and civic associations. Similar protests in defense of the..
I Hundreds of believers joined the open-air liturgy in the center of the second largest city in Bulgaria - Plovdiv, on the occasion of 1700 years since the First Ecumenical Council in Nicaea and the feast of the heavenly patron of the city - the holy..
On the eve of Children's Day - June 1, the National Network for Children took out a protest march with a starting point - the Courthouse in Sofia against violence against children. The march under the slogan "Let's protect our children. Let's..
“The attempts to attack me over the fact that I enacted the law on adoption of the Euro are a vapid manipulation because there are absolutely no dates..
Raising fines for traffic offences and an enhanced police presence – these are the measures announced by Interior Minister Daniel Mitov after the..
Protests in defence of the Bulgarian lev and against the adoption of the euro currency are scheduled to take place on May 31 in many cities and towns..
+359 2 9336 661