The planned two-year major repair of Danube Bridge 1 is expected to begin in July, announced the Ministry of Tourism. The initial intention was for the repairs to start in the autumn, after the summer tourist season, but due to the critical condition of the bridge and the crumbling pavement, which poses a real danger to those crossing it, urgent action had to be taken.
According to estimates of the Ministry of Regional Development and Public Works, the repair of Danube Bridge 1 will not significantly hinder traffic, as it will be regulated by traffic lights, without stopping traffic. The time required for processing documents at the border crossing will also compensate for any delays. ''Traffic will limited to one lane while the other is being repaired. Work will be carried out without days off and with extended working hours", said Regional Development Minister Violeta Koritarova, adding that Danube Bridge 1 has not been repaired for 70 years.
On Wednesday minimum temperatures will range between 3° C. and 8° C., for Sofia around 4° C. Visibility will be diminished in the morning in the valleys and lowlands. During the day the weather will be predominantly sunny with a temporary increase..
Social tensions from 1 July until 30 September this year are estimated at an index of 6.09, meaning “risks that are difficult to control”, on a scale of 1 to 210, indicates a survey by the sociological agency Myara, the Bulgarian news agency BTA..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of the government. Such a change was first made mention of by GERB leader Boyko Borissov after his party..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
+359 2 9336 661