Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

Photo: Road Infrastructure Agency

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian media. The works will be carried out every day for 10-12 hours, during daylight hours. Vehicles will travel in both directions on the lane that is not currently being repaired.

The estimated duration of the repairs is approximately 4.5 months per lane. An adaptive traffic light system will manage the traffic.
The total length of the Bridge of Friendship is 2,223 m. On the Bulgarian side, the Danube Bridge spans 1,057 m. No major repairs have been carried out since it was opened 70 years ago. The technical project for the repair of the facility provides for a complete replacement of the asphalt layers, panels, waterproofing, new road safety systems, markings, etc.

The Romanian authorities have been informed of the forthcoming rehabilitation through a series of meetings and letters.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

One more group of Bulgarian citizens return from Lebanon

The first group of Bulgarian citizens evacuated from Lebanon with the help of Canada came home last night, the Bulgarian Foreign Ministry has announced. This took place in close coordination between the Foreign Ministry’s Situation Centre, the..

published on 10/5/24 9:25 AM

Warning of hazardous precipitation across Bulgaria

On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest temperature will be 19-20°C, while in the eastern regions of the country the temperature will reach up to..

published on 10/4/24 6:55 PM

EU's court lifts requirement for trucks to return to operational centre every two months

The Court of Justice of the EU has overturned part of European legislation requiring trucks for international transport to return every two months to the carrier's base. With its decision, the institution confirmed all other..

published on 10/4/24 4:31 PM