The LNG terminal near the Greek town of Alexandroupolis has officially srarted commercial operations today, the Greek company Gastrade announced. The facility features state-of-the-art technology with a maximum regasification capacity of 5.5 billion cubic meters per year. A total of 14 Greek and international companies are participating in the project, committing almost all of the terminal's capacity until at least 2030.
The volumes from the LNG terminal can provide natural gas supplies to Greece, Bulgaria, Romania, North Macedonia and Serbia, as well as to Moldova and Ukraine to the east, and Hungary and Slovakia to the northwest. BTA recalls that the Bulgarian gas transmission operator Bulgartransgaz is a shareholder in the LNG terminal with a share of 20%.
The liberalization of the electricity market for household consumers and their entering the free electricity market, something companies did years ago, is being postponed. At least for now. The reform should have entered into effect on 1..
The preparation of the non-banking financial sector for the introduction of the euro is at a very advanced stage and a significant part of it has already taken concrete measures to adapt to the new currency, the new chairman of the Financial..
The likelihood of Bulgaria joining the eurozone on 1 January 2026 is growing by the day. The country would become the 21st EU member to adopt the single currency. The signals are coming both from the Bulgarian government, which has repeatedly stated..
The positive convergence report will have a positive impact on people's standard of living and purchasing power, as well as on the country’s business..
+359 2 9336 661