The LNG terminal near the Greek town of Alexandroupolis has officially srarted commercial operations today, the Greek company Gastrade announced. The facility features state-of-the-art technology with a maximum regasification capacity of 5.5 billion cubic meters per year. A total of 14 Greek and international companies are participating in the project, committing almost all of the terminal's capacity until at least 2030.
The volumes from the LNG terminal can provide natural gas supplies to Greece, Bulgaria, Romania, North Macedonia and Serbia, as well as to Moldova and Ukraine to the east, and Hungary and Slovakia to the northwest. BTA recalls that the Bulgarian gas transmission operator Bulgartransgaz is a shareholder in the LNG terminal with a share of 20%.
Petar Ganev , senior researcher at the Institute for Market Economics announced, for the BNR, the publication of their white paper of the Bulgarian economy – Unlocking growth: the road ahead after the election. “Concord should be sought and..
In the next 12 months, the Bulgarian business needs about 262,000 workers and specialists , according to a study by the Employment Agency. This is nearly 9.3% of the currently employed. Compared to the results in 2023, there is a..
There will be pilot testing of ground-based silver iodide generators for hail protection in two zones where the use of rockets is not allowed, the Deputy Minister of Agriculture Ivan Kapitanov said. At a meeting with Claude Berthet,..
Butter and vegetable oil are the products that have increased in price the most over the year. The retail price of vegetable oil will range between 3..
+359 2 9336 661