On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and leader of the Bulgarian Communist Party, Todor Zhivkov, turned the first sod for the country's northern transport axis. This was also the start of construction of the motorway ring in Bulgaria. The main designer of the route is engineer Dena Palankova, BTA recalls.
By 1985, the difficult section with numerous tunnels and bridges passing through the Vitinia Pass was completed. The highest viaduct in Bulgaria (120 meters) is situated in this section. The planned length of the highway route is 418 km, which makes "Hemus" the longest motorway in Bulgaria, but currently 191 km are completed and in use. A new 7 km-long section is soon to be put in use.
The tariffs imposed on European goods by the Trump administration are expected to have both direct and indirect effects on Bulgarian exports. The Ministry of Economy and Industry has calculated the direct impact at €468 million, while..
The Celestial Empire, the “world’s factory”—that is China, the globe’s second-largest economy. The Asian powerhouse is actively expanding its economic reach worldwide, with the Belt and Road Initiative as the apogee of these efforts, through which..
The demand for employees increased by 5% in August, or by over 1,700 more offers compared to July, one of the largest HR companies in Bulgaria reported to BTA. But on an annual basis there is a decline of 7% , or by 3,100 offers. The "Trade..
The annual growth of Bulgaria's gross domestic product will remain above 3% in the period 2025-2027 , according to a report by commercial credit insurer..
No disruptions or price increases are expected on Bulgaria’s fuel market following the US sanctions imposed on Russian oil companies Rosneft and Lukoil,..
+359 2 9336 661