The annual planned maintenance of Kozloduy NPP Unit 6 starts today and is expected to last until early December, the nuclear power plant has announced.
During the shutdown, technical maintenance of the systems and facilities will be carried out, which will ensure the safe and reliable operation of the unit. The planned measures related to the long-term operation of the nuclear power plant units will also be implemented. Unit 6 will also be reloaded with fresh nuclear fuel.
Editor: Diana Tsankova
Publication in English: Al. Markov
Photo: BGNES, library
On Friday, the lowest temperatures will be between 4°C and 9°C, reaching up to 12°C in the southeast, around 6°C in Sofia . During the next 24 hours, the weather will remain cloudy. It will rain in almost the entire country. During the day, rainfall..
The Varna District Court has released the city’s mayor, Blagomir Kotsev, on a financial bond of €102,258. Before the court’s decision was announced, supporters of the mayor and members of the We Continue the Change party gathered outside the..
Three people, including an Italian citizen, were arrested during last night's protest against the adoption of the 2026 budget in front of the National Assembly, the director of the Sofia Directorate of Internal Affairs, Chief Commissioner Lyubomir..
+359 2 9336 661