Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
The Bulgarian Food Bank’s Kilogram of Kindness food drive, is collecting food for the needy for the 12th consecutive time. Four to seven tons of food with a longer shelf lifeis expected to be collected – such as rice, lentils,..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common currency, the euro, both in the EU as a whole (74%) and in the euro area (81%). In Bulgaria,..
Despite the bad weather, dozens of children and their parents took part in an initiative for making toys for the Christmas decoration of the capital city. At the initiative of Sofia municipality, a workshop was put up in the square in front of..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
+359 2 9336 661