Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
President Rumen Radev announced in Dobrich the launch of the 22nd edition of the "Bulgarian Christmas" charity campaign. The theme of the campaign is "Giving Hope to a Child in Need". The aim is to raise money for high-tech equipment for early..
''The Eurozone remains a priority, but the caretaker cabinet expects the 51st Parliament to begin its work in order to discuss the state budget'', said caretaker Premier Dimitar Glavchev. ''Who would have thought that we could get into this situation?..
"We demand the resignation of the management of the Bulgarian Food Safety Agency for failing to address the problems, specifically the case with the infected sheep in Velingrad, the Co-chairman of the National Sheep and Goat Breeding Association Deyan..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
+359 2 9336 661