Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
Bulgaria will not have to bail out eurozone countries that are experiencing difficulties. This is what Lilyana Pavlova, former vice..
Bulgarian and Chinese researchers discussed scientific cooperation at a forum in Sofia on Friday, attended by representatives of the Bulgarian Academy of..
Bulgaria lacks a coherent national policy on refugees despite continued migrant flows , Vice President Iliana Iotova said on Wednesday, calling for a lead..
+359 2 9336 661