Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
As of 1 December until the end of February, driving an old car in the centre of Sofia will be subject to a EUR 25-100 fine. The fines for legal entities will be 10 times higher – from EUR 500 to EUR 1,000. The low emission zone was put in place..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
+359 2 9336 661