Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
"We Continue the Change" (PP) party called for a protest and blockade of the National Assembly building to stop the adoption of the budget for next year. The MPs are discussing the budget at first reading. PP received support for..
The share of foreign students in Bulgaria has more than doubled in the last decade. In 2013, they were nearly 4 percent while in 2025 their number reaches 9% of active students. This is indicated by the annual Ranking of Higher..
Over 3,000 antiques worth more than EUR 100 million have been seized in an international operation, coordinated from Sofia, the Greek police reported. One of the largest antiquities smuggling networks has been dismantled with the support of Europol..
Bulgaria will not have to bail out eurozone countries that are experiencing difficulties. This is what Lilyana Pavlova, former vice..
Bulgarian and Chinese researchers discussed scientific cooperation at a forum in Sofia on Friday, attended by representatives of the Bulgarian Academy of..
Bulgaria lacks a coherent national policy on refugees despite continued migrant flows , Vice President Iliana Iotova said on Wednesday, calling for a lead..
+359 2 9336 661