Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
PP-DB will not support a candidate for Speaker of the 51st Parliament from any party that has not supported the coalition's declaration for a cordon sanitaire against Delyan Peevski. They pointed out that this was the only way to..
The trial of six Bulgarians accused of spying for Russia continues in the United Kingdom. The head of the "spy cell" Orlin Rusev and Biser Dzhambazov pleaded guilty. Three others - Katrin Ivanova, Vanya Gaberova and Tihomir..
Today's eighth attempt by the Bulgarian MPs to elect a speaker of the National Assembly also proved unsuccessful. At the beginning of the day, there was a ray of hope that this time the people's representatives would reach a..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
+359 2 9336 661