Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and Feed (RASFF), BNR’s Vesselina Milanova reports. Over the same period this country has reported..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR 7,670), the government has decided, BGNES reports. The 60,000 leva (EUR 30,679) needed has been..
The tendency of Bulgarians returning from abroad is permanent. This became apparent during the forum “Europe is with me”, organized by the Ministry of Labour and Social Policy’s Human Resources Development Programme, the Bulgarian news agency BTA..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
The European Public Prosecutor’s Office has carried out searches in the Municipality of Plovdiv and in a company suspected of public..
+359 2 9336 661