Bulgarian Energy Minister Temenuzhka Petkova and Greek Minister of Environment and Energy Giorgos Stathakis have discussed the realization of Greece-Bulgaria Gas Interconnector project. The two sides will be working on an updated timetable so that the interconnector is put into operation by 2020, in synergy with the launch of the Trans-Adriatic gas pipeline. The tender procedures for the project are expected to be completed by the end of April.
Bulgaria lacks a coherent national policy on refugees despite continued migrant flows , Vice President Iliana Iotova said on Wednesday, calling for a lead institution to coordinate integration efforts. Speaking at a roundtable event on the..
Bulgarian and Chinese researchers discussed scientific cooperation at a forum in Sofia on Friday, attended by representatives of the Bulgarian Academy of Sciences (BAS), government officials, economists and public figures. Organised jointly by the BAS..
With the slogan “No to the division of workers! Yes to higher incomes!” the Confederation of Independent Trade Unions in Bulgaria (CITUB/KNSB) held a protest in front of the Members’ Entrance of the National Assembly. The demonstration took place ahead..
I have spoken many times with Minister of Foreign Affairs of North Macedonia Timčo Mucunski. He knows our position very well. His role..
Bulgaria will not have to bail out eurozone countries that are experiencing difficulties. This is what Lilyana Pavlova, former vice..
Bulgaria welcomes the consistent efforts of the US and President Donald Trump to establish a just and lasting peace in Ukraine, the..
+359 2 9336 661