2
The European Commission has approved 77 million EUR from the European Regional Development Fund to improve Sofia's integrated waste management system. The money is earmarked for the construction of a highly efficient plant for the simultaneous production of heat and electricity with fuel obtained from non-recyclable household waste. The process, called cogeneration, will provide the citizens of Sofia with affordable energy and will be environment-friendly. The facility will produce about 55 megawatts of heat and 19 megawatts of electricity. This will provide heat to 40,000 people and electricity to 30,000.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661