The section of the 2-kilometer “Zheleznitsa” tunnel under construction on the Struma Highway, where rocks collapsed yesterday on three workers, is extremely complex in terms of terrain and land structure.
The high moisture from recent rains is the reason for the crumbling rock to fall on people. This was what the executive director of the contractor company, Stefan Totev, said. He pointed out that the inspection of several institutions and the contractor's experts did not reveal a technological or human error.
The condition of the three injured workers is stable and their lives are out of danger.
New car sales in Bulgaria in October increased three times more than the average for the European Union , where the purchase of new cars is only 1.1%. According to the Association of European Automobile Manufacturers, 75.9% of cars registered in..
77 per cent of those employed in Bulgaria's secondary education system are ready to go out on strike demanding a pay rise in the sector, according to a national survey by Podkrepa trade union. Half of those surveyed are in favour of a nation-wide..
The damage control and fire-fighting teams in Shumen have responded to 10 reports of damage due to the strong wind, the Regional Directorate of the Interior Ministry has announced. More often than not the reports were of fallen trees and branches in..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
+359 2 9336 661