The section of the 2-kilometer “Zheleznitsa” tunnel under construction on the Struma Highway, where rocks collapsed yesterday on three workers, is extremely complex in terms of terrain and land structure.
The high moisture from recent rains is the reason for the crumbling rock to fall on people. This was what the executive director of the contractor company, Stefan Totev, said. He pointed out that the inspection of several institutions and the contractor's experts did not reveal a technological or human error.
The condition of the three injured workers is stable and their lives are out of danger.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661