An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
On Wednesday, the lowest temperatures will range between minus 8°C and minus 3°C, for Sofia around minus 7°C . During the day, snow showers in the northeastern regions will begin to stop, but in southeastern Bulgaria it will still snow in many places...
Career Foreign Service Officer Susan Falatko has arrived in Sofia on February 18 to assume the role of Chargé d’Affaires. Prior to this appointment, Ms. Falatko’s service includes assignments as Deputy Chief of Mission and Chargé d’Affaires at the..
Bulgaria's President Rumen Radev convened today a meeting of the National Security Advisory Council, dedicated to the risks and threats to national security arising from the spread of narcotic and intoxicating substances among the younger generation and..
The Bulgarian Ministry of Tourism will work to create a map of important, but hard-to-reach tourist and cultural-historical sites. The goal is then to..
Bulgarian Finance Minister Temenuzhka Petkova will travel to Brussels to provide an update on Bulgaria’s progress towards euro area accession. The..
Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced...
+359 2 9336 661