The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
A few hours before being sworn in for the second time as President of the United States, Donald Trump shocked the international community with the news that he was launching his own cryptocurrency, called $TRUMP. A precedent that provoked many questions..
The financial situation in the country is critical, Finance Minister Temenuzhka Petkova says. Which means that the good news – the slowing inflation rate (on an annual basis) and Bulgaria’s full accession to the Schengen area at the beginning of the..
Moody's Ratings has affirmed Bulgaria's long-term and short-term rating at Baa1 with a stable outlook. The affirmation of Bulgaria's Baa1 rating reflects the rating agency's expectations that Bulgaria's debt and creditworthiness indicators will remain..
In 2024, Bulgaria's exports of goods to third countries decreased by 5.1% compared to 2023, amounting to EUR 15.4 billion (30 114.9 million BGN),..
+359 2 9336 661