The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
The Consulate General of the Republic of Bulgaria in Toronto, together with the Bulgarian-Canadian Society of British Columbia, will organize consular days in Vancouver, BC on November 7 and 8, 2025, announced the team of the Bulgarian diplomatic..
The National Gallery Square 500 opens for the first time on November 4 at 6:00 p.m. an exhibition of Christo and Jeanne-Claude, marking the 90th anniversary of the birth of the creative tandem. The first acquisition of Christo's..
The Ministry of Finance and the Bulgarian National Bank are organizing a high-level conference today titled ''Bulgaria on the Doorstep of the Eurozone''. It will be held at the Boyana Residence and is part of the communication campaign for introducing..
The European Commission has presented a proposal for developing high-speed railway lines within the EU until 2040, linking the capitals in the EU, among..
The European Commission has decided to withhold EUR 215 million from the second payment under Bulgaria’s recovery and resilience plan, the EC told the..
Prokopan is the only railway tunnel on the Plovdiv-Burgas line. This became clear during a visit by Deputy Minister of Transport Lyuben Nanov, who was..
+359 2 9336 661