The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
Thirteen people were arrested in central Sofia during a specialized police operation aimed at countering illegal migration and preventing crimes committed by or against foreign nationals. The operation took place on April 16 and 17, said the Ministry..
Blind ultrarunner Victor Asenov has officially become part of the Everesting Hall of Fame, Sportal.bg reports. Between March 21 and 23, the ''Invictus'' Victor Asenov completed 19 consecutive ascents from Aleko Hut to Cherni Vrah Mount on..
Bulgaria has asked to withdraw its request to the European Commission for the second payment under the National Recovery and Resilience Plan, the Commission confirmed to BNR. The request was submitted yesterday following coordination with the..
For the first time, a unique collection of Western European textile panels (tapestries) is on display at the National Gallery – Square 500. The..
When carrying out border control and compensatory measures, Border Police officers also carry out checks in the automated information..
During the night, the cloud cover will break and decrease. There will still be light rain showers in some places in the southern..
+359 2 9336 661