The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
GERB leader Boyko Borissov said that he did not like budget 2026 and it would be frozen. Speaking to the media in parliament, Borissov said that the Joint Governance Council of the formations in the government, the Prime Minister..
North Macedonian Prime Minister Hristijan Mickoski accused attacked Macedonian Bulgarian journalist Vladimir Perev of staging the attack and self-harm, BGNES has reported. On November 21, in a shop in the center of Skopje, Perev..
+359 2 9336 661