The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
Today, on Holy Saturday, which is the last day of Holy Week preceding Easter, Christians commemorate the burial of Jesus Christ and his descent into hell to break its chains and reopen the gates of heaven for people. The Divine..
For the first time, a unique collection of Western European textile panels (tapestries) is on display at the National Gallery – Square 500. The exhibits were added to the collection in the 1960s by the Bulgarian National Bank as part of the..
Tonight, the cloud cover will be significant, with rain expected in parts of the western half of the country—more substantial in the central regions. The lowest temperatures will range between 6°C and 11°C, around 9°C in Sofia. On Saturday,..
For the first time, a unique collection of Western European textile panels (tapestries) is on display at the National Gallery – Square 500. The..
When carrying out border control and compensatory measures, Border Police officers also carry out checks in the automated information..
During the night, the cloud cover will break and decrease. There will still be light rain showers in some places in the southern..
+359 2 9336 661