Bulgaria’s Ministry of Finance announced that an inspection conducted by Public Financial Inspection Agency found serious violations in the completion of Hemus motorway. A contract between the Road Infrastructure Agency and Avtomagistralli EAD for the completion of Lots 7, 8 and 9 of Hemus Motorway to the tune of EUR 690 million excluding VAT was subject to inspection.
The inspection found that the estimated prices were inflated by more than EUR 9 million. Prices for various materials and construction works on the above-mentioned lolts of the motorway were also inflated. The inspection also found that the Public Procurement Act had been circumvented during subcontracting of construction works by Avtomagistral EAD under 15 design contracts.
After a heated debate, Parliament rejected the proposed GERB-SDS cabinet with Rosen Zhelyazkov as Prime Minister. It was supported by 98 MPs, with 138 voting against and two abstaining. Zhelyazkov, representing the first political force in Parliament,..
Ukrainian optimism clashes with European scepticism ahead of the NATO summit, with divisions emerging over defence spending and how the war will end. These are the conclusions of a report based on a new survey by the European Council on Foreign..
Under the program of the European Civil Protection Mechanism, 240 firefighters from 4 countries arrived in Greece to help their Greek colleagues, the Bulgarian Fire Protection Directorate has reported. Due to the high temperatures..
“Five people from the parliamentary group are going to be “torn apart” during the voting for a cabinet but will, most probably, not give their..
The first joint operation of the newly formed Mine Counter Measures Task Group Black Sea involving Bulgaria, Turkey and Romania is to take place July..
The caretaker government has fulfilled its main task successfully – organizing fair and transparent elections for National Assembly and for European..
+359 2 9336 661