“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
President Rumen Radev has issued decrees appointing Bulgarian ambassadors to the Kingdom of Belgium, the Kingdom of the Netherlands and the Republic of Kazakhstan. The decrees were published in the State Gazette, reported BTA. Natalia Evgenieva..
The 10th edition of the International Festival Da Fest presents works by leading global digital artists. Organised by Da Lab and the National Academy of Art, the five-day event begins today in Sofia. This year's theme, “Anxiety: Signals from an..
Bulgaria will allow a plane carrying Vladimir Putin to fly through its airspace to facilitate a planned meeting between the Russian leader and U.S. President Donald Trump in Budapest, said Bulgaria’s Minister of Foreign Affairs Georg Georgiev, as..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of..
+359 2 9336 661