“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C; in Sofia – about 1°C. In the morning, there will be reduced visibility along the river valleys. It..
The European Public Prosecutor’s Office has carried out searches in the Municipality of Plovdiv and in a company suspected of public procurement fraud related to the improvement of urban green and public spaces in the city, the EP..
In 2024, the gross domestic product of Bulgaria increased in real terms by 3.4% compared to the previous year, according to data by the National Statistical Institute, BTA reported. Gross national income at market prices last year..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of..
+359 2 9336 661