“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
Against the background of protests in different towns across the country against the “war on the roads”, the poor condition of roads, corruption in public procurement and flawed road repairs, Minister of Interior Daniel Mitov has ordered a..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until 2 May. Agreement on this was reached in Baku, Azerbaijan, by Bulgaria’s Minister of Energy Zhecho..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her life as she was returning from a holiday with her grandparents. A protest is scheduled for today..
Unemployment in Bulgaria is below 4 per cent , according to NSI data for March quoted and summarised by BNT. Last month also saw an 8% increase..
On the occasion of World Health Day (April 7), Bulgaria’s Premier Rosen Zhelyazkov expressed his deep appreciation and respect for doctors and..
The civic association "Angels on the Road" organized a protest in front of the Sofia Court House against the road traffic accidents that have claimed..
+359 2 9336 661