“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
Bulgaria has received its fourth air ambulance helicopter. “The new aircraft will be based at the Georgi Benkovski Air Force Academy hangar in Dolna Mitropolia. From there, it will serve a wide regional area and make a significant contribution to the..
The Bulgarian National Radio will host the 2025 Public Broadcasters International (PBI) Annual Conference . The prestigious forum will be held from 20 to 22 October for the first time in the Bulgarian capital Sofia. The theme of the PBI..
Plamen Dimitrov, president of Bulgaria’s largest trade union, the Confederation of Independent Trade Unions in Bulgaria (CITUB), has warned of a potential shortfall of around 17–18 billion leva (EUR 8.7–9.2 billion) in next year’s draft budget...
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of..
+359 2 9336 661