On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
The facilities in Bulgarian winter resorts are working, the conditions for skiing and tourism in the mountains are good. The Mountain Rescue Service of the Bulgarian Red Cross reported to BTA that the current weather conditions may..
The submission of the budget has been postponed by a week due to Bulgaria's commitment to prepare a structural and fiscal plan, BTA has reported. On the sidelines of parliament, Minister of Finance Temenuzhka Petkova explained that..
On the occasion of the Day of Saint Cyril, the Veliki Preslav Archaeological Museum presents the exhibition "In the Footsteps of the Students". The exhibition, dedicated to the creators of the Bulgarian alphabet, follows the Cyril..
Kristiyan Vladov and Stefan Kyurkchiev of the Plovdiv Museum of Natural History are working on a project to bring live fish from the southern Arctic..
Expanding connectivity between Bulgaria and Turkiye is an investment in the development of the entire region, President Rumen Radev said at a meeting..
The Ministry of Agriculture and Food will draft a law aimed at normalizing relations along the entire supply chain – from primary production, through..
+359 2 9336 661