On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
A conference entitled 'Prospects for the Integration of Refugees and Migrants into the Labour Market' is taking place in Sofia today. The event is organised by the Sofia Municipality as part of a project. It will bring together key experts,..
ATMs will be stocked with euros on the night of 1 January 2026, so that by morning everyone will be able to withdraw euro banknotes. Nikola Bakalov, CEO of one of Bulgaria’s leading banks and a member of the Management Board of the Association of Banks..
At the invitation of Bulgaria's Head of State, Rumen Radev, Lebanon's President, General Joseph Aoun, arrived on an official visit to Bulgaria. The visit takes place ahead of the 60th anniversary of the establishment of diplomatic relations between..
On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in..
The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security..
President Rumen Radev has vetoed the legislative amendments related to the appointment of a special commercial administrator in the..
+359 2 9336 661