On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
Shopping malls in Sofia and across the country will increase the number of security guards where needed. Additional panic buttons are also to be put in place if retailers wish, the Bulgarian Retail Association said. Groups of suspicious persons will be..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%, which marks a significant decrease compared to last year, when it was 11.61%. This is the lowest..
The Bulgarian MPs gathered in plenary today for a sixth attempt to elect a President, which again proved unsuccessful. The chances of electing a Speaker of the 51st National Assembly are minimal The candidates Natalia Kiselova from..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
During the night, the weather will be predominantly clear and calm. There will be fog or low clouds before midday in parts of the lowlands, valleys..
+359 2 9336 661