On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
It is very important, when we talk about the first 100 days of the government, to note that it adopted its program, the state budget and passed two votes of no confidence, Prime Minister Rosen Zhelyazkov said. At the opening of the meeting of the..
The Bulgarian Embassy in Washington organized an official ceremony to unveil a memorial plaque in honor of Dimitar Peshev, Deputy Speaker of the National Assembly in the period 1940–1943. He initiated the action against the..
Deputy Prime Minister Atanas Zafirov has met with Ambassador of India to Bulgaria, Arun Kumar Sahu, and discussed the possibilities for deepening the strategic partnership between the two countries. "India is a key partner for..
The political situation should give us the opportunity to start working with our compatriots outside the country, who have Bulgarian self-identity and..
On April 23 and 24 from 10 a.m. to 4 p.m. the movement of all vehicles through the Petrohan Pass - Road II-81 will be limited because the removal of..
On Wednesday , the lowest temperatures will be between 7 and 12°C. In Sofia it will be around 8°C. Before noon it will be sunny. In..
+359 2 9336 661