Tsarevo municipality will need ten days to draw up the documents for filling out the information about the damages inflicted by the flooding, documents which will be used to apply for financing at the interdepartmental commission for reconstruction and assistance, said Tsarevo mayor Georgi Lapchev.
A third inspection is to take place today of the towns and villages hit by the disaster, and of the infrastructure destroyed, Georgi Lapchev said. In the space of two days, experts from the municipality will provide data about the state of the bridge, connecting the old with the new town, and the causes leading to its collapse. On this bridge the floodwater swept away the four people who lost their lives in the flooding.
“The greatest amount of damage is in absolutely all lowest points on the territory of the municipality, the catchment areas, where there are bridges over the gullies,” the mayor stated.
Bulgaria remains a net exporter of electricity and one of the pillars of the energy system in Southeast Europe. Electricity exports exceed imports by 3.1% in 2024. According to this indicator, the country ranks 11th in Europe. Among the..
At a ceremony at the Vytautas Magnus University in the Lithuanian city of Kaunas , the rector of Sofia University “St. Kliment Ohridski”, Prof. Georgi Valchev, accepted the rotating presidency of the international university alliance..
For the third consecutive year, Karin Dom – Varna is organizing the charitable initiative “Ivan Stanchov Awards” in memory of the Bulgarian diplomat and founder of the organization, Ambassador Ivan Stanchov. On October 23, awards will be presented..
The first regular direct flights between Bulgaria and the United States are expected to begin in April 2026, Transport and Communications Minister..
Saturday will start off with lows between 6°C and 11°C, dropping to around 6°C in Sofia. Skies will brighten for a time over northern Bulgaria before..
The annual planned maintenance of Kozloduy NPP Unit 6 starts today and is expected to last until early December, the nuclear power plant has announced...
+359 2 9336 661