The Road Infrastructure Agency has launched a public procurement for the development of a conceptual design for the Montana-Sofia expressway with a tunnel under the Petrohan Pass. The length of the section is 82 km and the design speed is 120km/h. The indicative value of the design contract is EUR 3.3 million.
Until February 15 next year, offers will be accepted for the development of an extended conceptual design, complete engineering and geological studies and a detailed spatial plan for the expressway connecting the Montana bypass and the Sofia ring road. The task is to avoid crossing protected areas and to comply with all requirements in the Environmental Protection Act. The implementation deadline is 365 calendar days. The Sofia-Montana expressway with a tunnel under the Petrohan Pass is key to the national and the European transport network.
The Festival of Elena Dry-Cured Ham which will take place from October 24 to 26 in the town of Elena, offers a rich folklore program, competitions, demonstrations and tastings, the organizers from the Municipality of Elena and the Local Tourism Council..
The Institute of Agriculture-Kyustendil will celebrate the Festival of Agricultural Science today with a tasting of new apple varieties and hybrids, the institute’s director, Associate Professor Iliyana Krishkova, told BTA. Farmers will be presented..
On Friday, morning temperatures will range from 10 to 15°C, with 10°C in Sofia. Rain is expected in the western regions in the early hours. During the day, skies will remain cloudy as rain moves from west to east, gradually easing in the afternoon with..
The international scientific conference “Bulgarians in the Northern Black Sea Region” will be held in Sofia on October 27 and 28, 2025 in the Institute..
+359 2 9336 661