The Road Infrastructure Agency has launched a public procurement for the development of a conceptual design for the Montana-Sofia expressway with a tunnel under the Petrohan Pass. The length of the section is 82 km and the design speed is 120km/h. The indicative value of the design contract is EUR 3.3 million.
Until February 15 next year, offers will be accepted for the development of an extended conceptual design, complete engineering and geological studies and a detailed spatial plan for the expressway connecting the Montana bypass and the Sofia ring road. The task is to avoid crossing protected areas and to comply with all requirements in the Environmental Protection Act. The implementation deadline is 365 calendar days. The Sofia-Montana expressway with a tunnel under the Petrohan Pass is key to the national and the European transport network.
Fuel supplies for the domestic market are fully secured until the end of the year , Energy Minister Zhecho Stankov said, following the United States’ sanctions on Russian oil giants Lukoil and Rosneft. He added that the market would be closely monitored to..
“Bulgaria’s defence industry is renowned for its quality and enjoys an excellent international reputation. This offers great opportunities for close cooperation with Vietnam in the security sector,” President Rumen Radev said during a visit to the..
The Council of Ministers has proposed transferring vehicles from the National Security Service (NSO) to the Presidential Administration through a legislative change, Bulgaria National Radio reporter Tsvetelina Stoyanova reported. This would not put a..
The international scientific conference “Bulgarians in the Northern Black Sea Region” will be held in Sofia on October 27 and 28, 2025 in the Institute..
+359 2 9336 661