Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
The Ministry of Electronic Governance has announced that 63 Bulgarian companies will receive financial support under the programme “Support for Improving Cybersecurity in Small and Medium Enterprises in the Republic of Bulgaria”. The funding will be..
In a statement to Parliament, the “There Is Such a People” (ITN) party, which is part of the ruling coalition, insisted that the government take action to truly integrate Ukrainian refugees into the country. In its declaration, ITN insists that..
A military ceremony in memory of the heroes of Kaymakchalan was held on the mountain peak of the same name, located on the border between North Macedonia and Greece, the Ministry of Defense reported. This year marks 109 years since the Battle of..
On Tuesday, the lowest temperatures will range from 5°C to 10°C, up to 13°C along the Black Sea coast. In Sofia the lowest temperature will be around..
The two employees of the Executive Agency "Automobile Administration", who demanded bribes from foreign truck drivers transporting equipment for Robbie..
Bulgaria welcomes President Trump ’s concrete plan to put an end to hostilities in Gaza and acknowledge the swift and positive response by..
+359 2 9336 661