Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
As an EU member state and a NATO ally, Bulgaria is an active participant in solidarity initiatives aimed at strengthening our deterrence and defense capabilities, Prime Minister Rosen Zhelyazkov said in his speech at the Antalya Diplomacy..
The parliament adopted on second reading amendments to the Electronic Communications Networks and Physical Infrastructure Act. The aim is to shorten the terms for issuing documents for construction and putting digital technologies..
The average social security income for the country for February 2025 is 888.63 EUR, the National Social Security Institute (NSSI) has reported. Compared to the previous month, there is a rise of 2.42 EUR. In the period March 1,..
Energy Minister Zhecho Stankov attended the tenth edition of the Delphi Economic Forum in Greece. "Bulgaria is a reliable partner in the region's energy..
Sofia public transport workers will protest on Monday, April 14, demanding increase in wages . The decision to protest was made after meetings between the..
Testing of the sectional average speed control system began today. The tests are being conducted by the National Toll Authority in cooperation with the..
+359 2 9336 661