An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international children's drawing competition "Health 2025". The award ceremony took place in Sao Paulo,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start of the Burgas Airport concession. The investment in one of the largest infrastructure projects by..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory, the government press service announced. The State Agency for National Security (SANS) entered the..
On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in..
The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security..
Bulgaria’s Energy Minister, Zhecho Stankov, has reassured citizens and businesses that the country’s fuel supplies are sufficient to last for an extended..
+359 2 9336 661