An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in 2020, which claimed the lives of more than 200 people and injured thousands. The judges requested..
A conference entitled 'Prospects for the Integration of Refugees and Migrants into the Labour Market' is taking place in Sofia today. The event is organised by the Sofia Municipality as part of a project. It will bring together key experts,..
ATMs will be stocked with euros on the night of 1 January 2026, so that by morning everyone will be able to withdraw euro banknotes. Nikola Bakalov, CEO of one of Bulgaria’s leading banks and a member of the Management Board of the Association of Banks..
On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in..
The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security..
Bulgaria’s Energy Minister, Zhecho Stankov, has reassured citizens and businesses that the country’s fuel supplies are sufficient to last for an extended..
+359 2 9336 661