An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
The ruling GERB party claimed that employers are in favour of a higher VAT rate, but employer organisations denied this, insisting that no such proposal had ever been made. This clarification followed a meeting between GERB leader Boyko Borissov..
Ninety participants representing 57 Bulgarian folklore ensembles from across Europe and North America gathered in Sofia for their fourth Creative Meeting and Seminar. The event was highly constructive, featuring useful workshops and guest lecturers...
The European Commission has disbursed €438.6 million to Bulgaria as part of the second payment under the Recovery and Resilience Facility (RRF). On 3 October 2025, the Commission partially approved the payment, stating that Bulgaria "still needs to..
On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in..
The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security..
Bulgaria’s Energy Minister, Zhecho Stankov, has reassured citizens and businesses that the country’s fuel supplies are sufficient to last for an extended..
+359 2 9336 661