Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Outage of Kozloduy NPP’s reactor 6 for preventive maintenance

Photo: Kozloduy NPP

An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.

The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.

The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria switches to daylight saving time on last Sunday of March

On 30 March, Bulgaria is switching to daylight saving time, the Bulgarian Institute of Metrology has announced, as reported by the Bulgarian news agency BTA. At 3 AM on 30 March, clocks must be set forward by one hour. The country switched to..

published on 3/11/25 9:18 AM
onstitutional Court President Pavlina Panova

Constitutional Court accuses Central Election Commission and Information Services of sabotage

The Central Election Commission (CEC) must carry out the re-calculation of the election results it has been tasked with by the Constitutional Court. This will show whether there are any changes in the distribution of seats in the 51 st National..

published on 3/11/25 8:59 AM

Strong wind warning for 18 regions of Bulgaria on Tuesday

A yellow code for strong wind has been issued for 18 regions of Bulgaria on  Tuesday . The minimum temperatures will be 4 to 9°C, around 4°C in Sofia.   It will be sunny over most of the country before noon.  Cloudiness will increase in the..

published on 3/10/25 7:15 PM