An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
“The excuses of the ruling coalition that they are waiting for the promulgation of the amendments to the Act on the Administrative Regulation of Economic Activities Related to Oil and Petroleum Products they themselves voted, in order to protect..
Bulgaria was officially designated among the EU countries at risk of migratory pressure, BNR’s correspondent in Brussels Anguelina Piskova reports, citing the European Commission’s first European Annual Asylum and Migration Report. The document is..
President Rumen Radev has vetoed some of the amendments to the Defence and Armed Forces Act of the Republic of Bulgaria adopted on 30 October this year, the presidential press service has announced. In his motives the president points out that..
On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in..
The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security..
Bulgaria’s Energy Minister, Zhecho Stankov, has reassured citizens and businesses that the country’s fuel supplies are sufficient to last for an extended..
+359 2 9336 661