Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Outage of Kozloduy NPP’s reactor 6 for preventive maintenance

Photo: Kozloduy NPP

An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.

The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.

The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

The sun also rises on Wednesday

On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in lowland and basin areas. Later during the day, cloud cover will decrease to mostly sunny in many..

published on 11/11/25 7:05 PM

Average social security income reaches 962.25 EUR

The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security income for the country for the period October 1, 2024 to September 30, 2025 is 919.3 EUR, the..

published on 11/11/25 5:46 PM
Zhecho Stankov

Bulgaria has ample fuel reserves, says Energy Minister

Bulgaria’s Energy Minister, Zhecho Stankov, has reassured citizens and businesses that the country’s fuel supplies are sufficient to last for an extended period. “Our priority is secure supply at affordable prices — and that is guaranteed, ” Stankov..

published on 11/11/25 4:37 PM