An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
“There is a consistent trend towards a drop in numbers and a curbing of the migration pressure,” Border Police Director, Chief Commissioner Anton Zlatanov, Director said in an interview for bTV. “When I took office, illegal migration had reached..
On 10 March, the Central Election Commission (CEC) is to hand the calculations from the election results over to the Constitutional Court. CEC Deputy Chair Mateva: Recalculation of election results should be ready by the end of next week..
“Bulgaria’s defence industry has a huge potential, we have to promote it,” said Foreign Minister Georg Geigriev in an interview with bTV. “I believe the strategic partnership between the EU and the US must continue,” he said and added that..
Vazrazhdane party has sent a formal request to President Rumen Radev to call a referendum on keeping the Bulgarian Lev , the party’s leader Kostadin..
The Central Election Commission (CEC) must carry out the re-calculation of the election results it has been tasked with by the Constitutional Court...
A yellow code for strong wind has been issued for 18 regions of Bulgaria on Tuesday . The minimum temperatures will be 4 to 9°C, around 4°C in Sofia...
+359 2 9336 661