Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Outage of Kozloduy NPP’s reactor 6 for preventive maintenance

Photo: Kozloduy NPP

An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.

The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.

The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria calls on Russia to stop disturbing satellite and RNSS signals

''Russia continues to disturb satellite and Radio Navigation Satellite System (RNSS) signals, affecting European countries’ critical infrastructure and services'', Bulgaria’s Ministry of Foreign Affairs wrote on X. Von der Leyen’s plane..

published on 11/11/25 9:03 AM
Vitosha Mountain, near Sofia

Autumn rains in the Danube Plain, winds in Thrace

On Tuesday, minimum temperatures will range from 8 to 13°C , with Sofia seeing around 9°C. Rain is expected across the country, with heavier showers in north-eastern and central Bulgaria. Yellow alerts have been issued for twelve regions and orange alerts..

published on 11/10/25 7:05 PM

Road Infrastructure Agency proposes restrictions on the movement of heavy trucks on motorways during holidays

The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along the country’s busiest motorways — Trakia, Hemus and Struma— during official holidays in 2026. The..

published on 11/10/25 6:05 PM