“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
The Renew Europe political group in the European Parliament has established a working group to examine instances in which the Bulgarian government may have acted against the rule of law. The move comes in response to what the group describes as..
As of December 31, 2024, there were 3,765,000 people of working age, or 58.5% of the country's population. Men are 1,970,000, and women - 1,795,000. This was announced by the Deputy Chair of the National Statistical Institute (NSI)..
President Rumen Radev has sent a letter to President Cyril Ramaphosa expressing his gratitude for the decision of the Republic of South Africa to lift visa requirements for short-term stays for Bulgarian citizens. Radev..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of..
+359 2 9336 661