“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
Donald Trump Jr., the eldest son of the US president, is embarking on an Eastern European tour that will include Prague, Bratislava, Budapest, Belgrade, Sofia and Bucharest, Romanian media Digi24 and G4 Media report. In Bucharest,..
The football match should not be a battlefield, but a place where you can take your child – this motive united the organizers of the "At a match with a daisy" campaign. The campaign will take place over four days – from April 11 to..
A drop in the price of natural gas in the coming months due to the collapse of prices on world markets – this is the forecast of the chairman of the Energy and Water Regulatory Commission, Plamen Mladenovski, in an interview with..
Unemployment in Bulgaria is below 4 per cent , according to NSI data for March quoted and summarised by BNT. Last month also saw an 8% increase..
The path to the economic prosperity of the Roma people goes through cultural legitimacy, says Ognyan Isaev, director of the Educational Opportunities..
The Ministry of Justice has published for public discussion a package of legislative changes against delay in serious road accident cases. These..
+359 2 9336 661