“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
The Sofia district court has left 45-year old Bulgarian former athlete Petar Dachev in custody. Dachev was detained on 2 April in the region of Petrohan pass for possession of 30 kgs. of cocaine, public service TV BNT reports. The cocaine, hidden..
Against the background of protests in different towns across the country against the “war on the roads”, the poor condition of roads, corruption in public procurement and flawed road repairs, Minister of Interior Daniel Mitov has ordered a..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until 2 May. Agreement on this was reached in Baku, Azerbaijan, by Bulgaria’s Minister of Energy Zhecho..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the..
+359 2 9336 661